Translations:Monitoring levels when you can't see the meters/17/en

From Reaper Accessibility Wiki
Revision as of 06:02, 3 June 2023 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
using Peakwatcher After Rendering
  • Set it up to monitor your master track until reset. In this example we will monitor the master track as second track.
  • Reset the peakwatcher before rendering by pressing shift+alt+F8 for resetting the second track.
  • Render your project as usual.
  • After rendering your project, check the values with alt+shift+F9.